Skip to content
How it works

From first call to first footsteps.

Every project follows the same six steps, from the phone call to the walk-through. Here is what happens, in what order and why.

A flooring estimator seen from behind snapping a chalk line across a bare subfloor in an empty room to mark the layout, with a tape measure and a laser level nearby
Six rows, in order.
  1. 01
    A homeowner seen from behind on a phone call at a bright kitchen island with a laptop showing flooring photos, fanned flooring sample swatches and a window onto a backyard in morning light

    You call, we listen

    We ask about your home, how you live, the rooms and the look you picture, then book a time to walk the space.

    A call, a text or the form
  2. 02
    A flooring estimator seen from behind snapping a chalk line across a bare subfloor in an empty room to mark the layout, with a tape measure and a laser level nearby

    We measure and mark the layout

    We measure every room, check the subfloor, moisture and doorways and chalk the layout lines so the first row is straight.

    Measured, not guessed
  3. 03
    An installer seen from behind sweeping and vacuuming a bare plywood subfloor before flooring goes down, with a straightedge laid across the floor to check flatness and a bucket of floor patch nearby

    We prepare the base

    Old flooring comes out, the subfloor is cleaned, patched and leveled and moisture is tested, because a floor is only as good as what is under it.

    Flat, dry and firm
  4. 04
    Two installers seen from behind laying wide oak planks in staggered rows across a room, one tapping a plank with a mallet, with boxes of planks and a miter saw at the side

    We lay the floor

    Planks, tiles or sheets go down row by row with the right gaps, adhesive and cuts, and the pattern is checked as it grows.

    Row by row, checked as we go
  5. 05
    A craftsperson's hands nailing white baseboard trim and setting a brass transition strip at a doorway on a freshly finished oak floor

    We trim it out

    Baseboards, thresholds and transitions go in, the floor is sanded, grouted, sealed or finished, and the room is cleaned up.

    Details done right
  6. 06
    A flooring crew lead and a homeowner couple seen from behind walking across a beautiful finished oak floor in a sunlit living room

    We walk it with you

    We walk the finished floor together, show you how to care for it and answer questions. You get a clean room and a floor to enjoy.

    A clear handover
Before we arrive

Your quick home list.

  • Walk the rooms and note what bothers you about the floors now
  • Think about how you live: pets, kids, shoes and spills
  • Tell us about stairs, closets, thresholds and any heavy furniture
  • Note where the water shut-off and the power outlets are
  • Take a few photos of the floors and rooms, if you can
Our standards

Six promises we keep.

Measured, not guessed

Rooms, subfloors and moisture are measured before any price is written.

Prep done right

Old floors, leveling and moisture are handled first, because the base decides the result.

Everything in writing

The scope, the materials, the schedule and the price spelled out before work starts.

Honest about options

If a simpler or tougher floor suits you better, you hear it from us first.

A tidy finish

Dust is controlled, trimmings are bagged and the rooms are left clean.

Talk it through by phone

Call or text and we talk it through with you, with photos if that helps.

Good questions

Process questions

How do I get a price?

Fill in the form on any page, or call or text 800-224-9245. Tell us the rooms, the floor you have now and the look you want, and send a photo if you can. We measure, check the subfloor, then send a written estimate.

How long does flooring installation take?

A single room can take a day, and a whole floor with prep, leveling and finishing takes longer. Tile, concrete and refinishing jobs need drying and curing time. Your written estimate gives a schedule for your project.

Do I need to move my furniture?

We can move furniture for you, or you can clear the rooms before we arrive. Tell us when you book, and we agree who moves what, including heavy pieces, appliances and pianos.

How do I get ready for installation day?

Clear the work area, plan for pets and children, make sure the crew can reach the rooms and tell us about parking and alarms. Our Floor Journal has a checklist, and we explain acclimation, drying and when furniture can go back.

Start with the easy part.

Call, text a photo or fill in the form. We quote before any work begins.

Free estimate

Tell us about your floors.

Tell us about the rooms, the floor you have now and the look you want. We read every message and reply with straight answers and a written quote.

  • A few details or a photo of the rooms, so we know what we are walking into
  • A clear plan: the floor, the prep, the timing and what it costs, before anything starts
  • Photos along the way on request
Prefer to talk? Call or text800-224-9245

Your free estimate

We only use your details to respond to your request.